EnergyPlex Park 2

 

Location: 3915 South Main St, Roswell, NM (Subdivision-KREBS SUM PLAT 2 Block 0 Lot 2, STR 21/11S/24E)

Owner: Wetco LLC, 8324 Sterling St. Irving, TX 75063

Size: Approximately 145 acres

Zoning: Rural Suburban District. Comprehensive plan supports rezone to commercial or industrial.

Asking Price: $30,000/acre

Wetco Brochure (PDF)

Highway Access: Local surface streets to US 285 Truck bypass or to US 285 (direct north south through center of Roswell); closest interstate is 140 miles via primarily 4 lane Highway.

Air Access: Roswell International Air Center, approximately 10 minutes south of site. Limited commercial service to Dallas/Fort Worth International Airport and Phoenix International Airport (3-4 flights daily).

 

Rail Access: No rail access.

Electric Power: Xcel Energy. 12.47kV distribution. 2 additional transmission lines: a 69kv line runs within east side of site and a 115kV line runs along the north side of site.

Natural Gas: New Mexico Gas Company. Adjacent: 6” HP runs E-W within 100’ of site along middle of Brasher St. 2” HP runs N-S along Main St. Available pressure is 51 MAOP PSIG / 45,000 CFH.

Water: City of Roswell. 12” lines on both Brasher and Main Sts. at site boundary. Capacity is 4.7 MGD at 60 psi. System capacity is 30 MGD.

Sewer: 8“ currently at site right of way, leading to 30” line at Brasher. Line capacity is .28 MGD. System capacity is 7.5 MGD.

Storm Water: Will be determined by specific site development plan, based on a Storm Water Pollution Prevention Plan (SWPP) and historic flow preservation.

Telecom/Fiber: Fiber provided on Main St., adjacent to site. Line capacity is 1-10+ Gigabit/second. Up and down data bandwidth is 1000MB/sec (1 Gig) by 1000MB/sec (1 Gig). Providers are CenturyLink and Plateau.

Available Site Due Diligence Documentation

Title Commitment: Yes
Aerial Site Views and Maps: Yes
Park Master Plan: Yes
Utility Service Maps: Yes
Site Dimensions and Configuration: Yes
Wetlands Map: None
Phase 1 Environmental Assessment: Yes
Archeological and Historic Use Assessments: None
Park Covenants and Restrictions: None
Transportation Access Maps: Yes
Geotechnical Study/ Soil Survey: No
FEMA Flood Plain Designation with Map: Yes
Air Attainment Status: Yes
Endangered Species Assessment: Not required

Available General Community Information

Community Profile and Demographics: Yes
State and Local Incentives Overview: Yes
Letters of Support: Yes
Business and Industrial Support Services and Amenitites Profile: Yes

Economic Development Contact

John Mulcahy, President
JMulcahy@chavescounty.net
5
75-740-0739

Roswell Chaves County
Economic Development Corp
200 North Main
Roswell, NM 88201

Xcel Energy Contact

Stephanie Dybsky, Manager, Corporate Economic Development
Stephanie.J.Dybsky@xcelenergy.com
303-294-2805

Xcel Energy
1800 Larimer Street
Denver, CO 80202